Skip to main content
Version: v2.6

Optimization Dashboard

The Optimization Dashboard offers insights into process effectiveness and efficiency, helping identify cost-saving opportunities and trends. The sheet allows for timeframe selection, key figure analysis, and links to detailed worksheets for deeper insights. Users can analyze key metrics — case volume, automation rate, lead time, rework rates and process variants. By visualizing trends, it enables data-driven process improvements.

Optimization Dashboard
Optimization Dashboard
Type: Dashboard

tip

At the top left of the worksheet a specific timeframe can be selected by choosing a start and end date.

Each key figure represents a potential time or cost-saving opportunity across the entire process. Use the filter options to refine your analysis.

tip

Each section has a button that will take you to the corresponding sheet, which provides a more in depth analysis.


Process Effectiveness​

Process Discovery​

Process Discovery
Process Discovery
  • # Cases Displays the number of cases processed through a specific workflow.
  • Higher case volume generally indicates a more effective process.
  • The timeline below illustrates case volume trends over time.

Lead Times​

AVG Lead Time
AVG Lead Time
  • AVG Lead Time – Represents the average time required to complete the entire process.
  • A lower value signifies a faster, more efficient process.

Process Efficiency​

Automation​

Automation
Automation
  • % Automation Rate - Indicates the percentage of automated steps within the process.
  • A higher automation rate generally leads to greater efficiency.
  • Cost Saving Potential - Displaying the Cost Saving Potential that could be achieved by automating more process steps.

Rework​

Rework
Rework
  • % First Time Right Cases – Shows the percentage of cases completed without rework in any activity.
  • A higher percentage is desirable, indicating fewer errors and inefficiencies.
  • A timeline visualization helps to track trends over time.
  • Cost Saving Potential – Displays the Cost Saving Potential that can be achieved by eliminating rework cases.

Process Complexity​

Conformance​

Conformance
Conformance
  • AVG % Process Conformance – Shows the percentage of cases in this process that are conform to the process model.
  • Cost Saving Potential – Displays the Cost Saving Potential that can be achieved by eliminating deviations.

Variants​

Variants
Variants

Displays A-, B-Variants and C-Variants, along with their number of activities, as well as the Cost-Saving Potential that can be achieved by omitting these variants.

info
  • A-Variants (80%) – The most common process variants, covering 80% of all cases.
  • B-Variants (15%) – Variants covering the next 15% (80-95% of cases).
  • C-Variants (5%) – The least common variants, covering the last 5% of cases.
  • A high number of B and C variants indicates a complex process.